The Ultimate Guide to Planning Poker: Master Agile Estimation in 2025

Master agile estimation with our comprehensive planning poker guide. Learn fibonacci sequence, story points, best practices, and how to run effective scrum estimation sessions.

Published on November 21, 2025

The Ultimate Guide to Planning Poker: Master Agile Estimation in 2025

Agile estimation remains one of the most challenging aspects of software development, yet it's critical for sprint planning and project success. Enter Planning Poker—a consensus-based technique that transforms estimation from a tedious, error-prone task into an engaging team activity that improves accuracy by up to 40%.

Whether you're new to agile methodologies or looking to refine your scrum estimation process, this comprehensive planning poker guide will equip you with everything you need to master this powerful technique in 2025.

What Is Planning Poker?

Planning Poker (also known as Scrum Poker) is a gamified consensus-based estimating technique used by agile teams to estimate the effort, complexity, or size of user stories and tasks. Rather than having one person dictate estimates, Planning Poker leverages the collective wisdom of the entire team, resulting in more accurate predictions and better team alignment.

At its core, Planning Poker uses specially designed cards—typically featuring the Fibonacci sequence—to ensure that team members estimate simultaneously and independently, eliminating anchoring bias and creating space for valuable discussion about divergent viewpoints.

Why Planning Poker Matters

Traditional estimation methods often suffer from several problems:

  • Dominant voices override quieter team members: Senior developers or managers can inadvertently pressure others to agree with their estimates
  • Anchoring bias: The first estimate mentioned influences everyone else's thinking
  • False precision: Teams waste time debating whether a task is 16 or 17 hours when such precision is impossible
  • Individual blindspots: Single estimators miss important complexity factors that others would catch

Planning Poker solves these issues by creating a structured process where every voice is heard equally, uncertainty is acknowledged, and the team engages in meaningful dialogue about the work ahead.

When to Use Planning Poker

Planning Poker works best for:

  • Sprint planning sessions: Estimating user stories for the upcoming sprint
  • Backlog grooming: Refining and sizing items in the product backlog
  • Project kickoff meetings: Initial estimation for epics and major features
  • Release planning: High-level estimation for longer-term roadmap items

Planning Poker is most effective when estimating work that involves uncertainty and complexity. For simple, routine tasks where effort is well-understood, the overhead of Planning Poker may not be necessary.

The History and Origins of Planning Poker

Understanding where Planning Poker came from provides valuable context for why it works so well.

James Grenning's Innovation (2002)

Planning Poker was first defined and named by James Grenning in 2002. The inspiration came from a frustrating planning meeting where two senior engineers dominated the discussion for 30-60 minutes per user story while six other developers sat passively, contributing little to the estimation process.

Grenning recognized that this approach wasted the team's collective intelligence and created estimates based on limited perspectives. He drew inspiration from the Wideband Delphi technique—a consensus-based estimation method established by the RAND Corporation in the mid-20th century—but adapted it specifically for agile teams with faster cycles and more interactive collaboration.

The breakthrough was introducing physical cards that forced simultaneous estimation, preventing dominant voices from influencing the group prematurely and ensuring every team member had equal input.

Mike Cohn's Popularization (2005)

While Grenning invented Planning Poker, it was Mike Cohn of Mountain Goat Software who popularized the technique through his influential 2005 book "Agile Estimating and Planning." Cohn refined the methodology, formally incorporated the Fibonacci sequence into the card values, and provided comprehensive guidance on facilitation best practices.

Cohn's evangelism helped Planning Poker become the de facto standard for agile estimation, adopted by countless scrum teams worldwide. His work transformed what was a clever innovation into an essential agile practice.

How Planning Poker Works: A Step-by-Step Process

Planning Poker follows a structured process that balances efficiency with thorough discussion. Here's how a typical Planning Poker session unfolds:

Step 1: Prepare Your Materials

Before the session begins, ensure you have:

  • Planning Poker cards for each participant (physical cards or digital tool)
  • Prioritized backlog with user stories ready to estimate
  • Definition of ready criteria confirmed for each story
  • Designated facilitator to guide the process

The facilitator is typically the Scrum Master or Product Owner, though any team member can serve in this role.

Step 2: Establish a Baseline Reference

Start by selecting 2-3 user stories that the team has already completed and agree on their relative sizes. For example:

  • "Add password reset button" = 3 story points (small, straightforward)
  • "Implement user authentication" = 8 story points (medium complexity)
  • "Build reporting dashboard" = 21 story points (large, complex)

These reference stories serve as anchors for comparing new work. Teams should periodically revisit and recalibrate these baselines as their velocity and understanding evolves.

Step 3: Present the User Story

The Product Owner presents a user story from the backlog, explaining:

  • Business value: Why this work matters to users or stakeholders
  • Acceptance criteria: What "done" looks like
  • Dependencies: Any technical constraints or prerequisites
  • Context: How this fits into the larger feature or epic

Team members can ask clarifying questions during this phase. If questions reveal that a story lacks sufficient detail, the team should defer estimation until the Product Owner provides more information.

Step 4: Discussion and Clarification

Before estimating, developers discuss the implementation approach:

  • What components need to be modified?
  • Are there any technical unknowns or risks?
  • Will this require database changes, API modifications, or UI updates?
  • Does anyone have experience with similar work?

This discussion is where much of Planning Poker's value emerges. Different team members bring different perspectives—a backend developer might flag database complexity that the frontend developer hadn't considered, while a QA engineer might raise testing challenges that will add effort.

Keep this discussion time-boxed (typically 3-5 minutes) to maintain momentum. If the discussion reveals significant unknowns, consider breaking the story down further or conducting a technical spike.

Step 5: Estimate Simultaneously

Once discussion concludes, each team member privately selects a card representing their estimate. All participants then reveal their cards simultaneously.

This simultaneous reveal is crucial—it prevents anchoring bias where early estimates influence later ones. Everyone's initial judgment is pure, unaffected by others' opinions.

Step 6: Discuss Divergent Estimates

When estimates align (everyone picks the same or adjacent values), the team has consensus. Record the estimate and move to the next story.

When estimates diverge significantly (e.g., someone picks 3 while another picks 13), the facilitator asks the outliers to explain their reasoning:

  • High estimator: "What complexity or challenges are you seeing?"
  • Low estimator: "What makes you think this is simpler than others estimated?"

These conversations often reveal critical information. The high estimator might know about a legacy code issue that will complicate implementation. The low estimator might have recently built a reusable component that makes this work easier.

Step 7: Re-estimate and Reach Consensus

After hearing from the outliers, the team re-estimates. Often, estimates converge as the discussion reveals shared understanding. If significant divergence persists after 2-3 rounds, consider:

  • Breaking the story down: The story may be too large or vague
  • Researching unknowns: Schedule a technical spike to gather information
  • Averaging or taking the median: Use the middle value as a compromise
  • Defaulting to the higher estimate: Err on the side of caution for uncertain work

Avoid endless debate. The goal is reasonable consensus, not perfect precision.

Step 8: Record and Move On

Once the team reaches consensus, record the estimate on the user story (typically in your project management tool like Jira, Linear, or Azure DevOps). Then move to the next story.

Most teams can estimate 10-20 user stories per hour once they become proficient with the process.

Understanding the Fibonacci Sequence and Why It Works

The most common Planning Poker card set uses the Fibonacci sequence: 0, 1, 2, 3, 5, 8, 13, 21, 34, 55, 89. Understanding why this sequence is so effective will help you use it more intelligently.

The Mathematical Foundation

The Fibonacci sequence is a series of numbers where each value is the sum of the two preceding numbers:

  • 0 + 1 = 1
  • 1 + 1 = 2
  • 1 + 2 = 3
  • 2 + 3 = 5
  • 3 + 5 = 8
  • 5 + 8 = 13

Each number represents approximately a 60% increase from the previous one. This proportional growth mirrors how human brains naturally perceive differences in size and complexity.

Why Fibonacci Beats Linear Sequences

Using consecutive integers (1, 2, 3, 4, 5, 6, 7, 8, 9, 10) creates several problems:

  1. False precision: Teams waste time debating whether a task is 16 or 17 hours when such accuracy is impossible for future work
  2. Too many choices: More options slow down decision-making without improving accuracy
  3. Ignores uncertainty growth: Larger tasks inherently have more uncertainty, which linear scales don't reflect

The Fibonacci sequence solves these issues by intentionally creating gaps that acknowledge uncertainty.

Weber's Law and Just-Noticeable Difference

The Fibonacci sequence aligns with Weber's Law, a principle from psychophysics that explains human perception. Weber's Law states that the just-noticeable difference (JND) between two stimuli is proportional to the magnitude of the stimuli.

Consider weight perception:

  • You can easily distinguish between 1kg and 2kg (100% difference)
  • You'd struggle to distinguish between 20kg and 21kg (5% difference)
  • You'd need 20kg vs. 24kg (20% difference) to reliably perceive the difference

Similarly, distinguishing between a 1-point and 2-point story is meaningful. But distinguishing between a 20-point and 21-point story is nearly impossible—the difference is too small relative to the size.

The Fibonacci sequence ensures that each step up represents a perceptually significant increase, making estimates both faster and more reliable.

Fibonacci Reflects Growing Uncertainty

Small tasks (1, 2, 3 points) have relatively predictable effort because they're simple and well-understood. But as tasks grow larger (13, 21, 34 points), uncertainty compounds:

  • More components are involved
  • More integration points exist
  • More unknowns can emerge
  • More assumptions prove incorrect

The widening gaps in Fibonacci acknowledge this reality. When you estimate something as 21 points rather than 13, you're not just saying it's 8 points larger—you're saying "this is significantly more uncertain, and our estimate has a wider range."

Built-In Range Concept

Each Fibonacci number implicitly represents a range. An 8-point story means "somewhere between 5 and 13 points of effort." This range concept prevents teams from wasting time pursuing false precision while still providing meaningful relative sizing.

Proven Efficiency Gains

Research shows that using the Fibonacci sequence speeds up estimation time by up to 80% compared to other approaches. Teams make decisions faster because the gaps force decisive choices rather than nitpicking over minor differences.

Different Card Sets for Planning Poker

While Fibonacci is the most popular, several other card sets work well for different contexts and team preferences.

Modified Fibonacci (Most Common)

Values: 0, 0.5, 1, 2, 3, 5, 8, 13, 20, 40, 100, ?, ∞

This is the standard Planning Poker deck with some helpful additions:

  • 0: For trivial tasks requiring minimal effort (updating text, fixing typos)
  • 0.5: For very small tasks that still require some work
  • 20, 40, 100: Rounded versions of larger Fibonacci numbers for simplicity
  • ?: "I don't understand this story well enough to estimate"
  • ∞ (infinity): "This is too large to estimate and must be broken down"
  • ☕ (coffee cup): "I need a break"

T-Shirt Sizes

Values: XS, S, M, L, XL, XXL

T-shirt sizing works well for:

  • High-level estimation: Sizing epics or themes before breaking them into stories
  • Non-technical stakeholders: Business users find t-shirt sizes more intuitive
  • Rapid estimation: When speed matters more than precision

T-shirt sizes can be mapped to Fibonacci values later:

  • XS = 1-2 points
  • S = 3-5 points
  • M = 8-13 points
  • L = 21-34 points
  • XL = 55+ points

Powers of 2

Values: 1, 2, 4, 8, 16, 32, 64

Some teams prefer powers of 2 because:

  • Doubling pattern is intuitive: Each step represents 2x the previous effort
  • Aligns with technical thinking: Developers are familiar with binary doubling from computer science
  • Simpler mental math: Easier to calculate sprint capacity

However, powers of 2 grow more aggressively than Fibonacci, which can make mid-range distinctions harder (the jump from 8 to 16 is quite large).

Linear Scales (Not Recommended)

Values: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10

While tempting for their simplicity, linear scales have significant drawbacks:

  • Teams waste time debating tiny differences (is it a 7 or an 8?)
  • False precision creates false confidence
  • Doesn't reflect the reality of growing uncertainty
  • Slower estimation process

Most teams that start with linear scales eventually switch to Fibonacci after experiencing these frustrations.

Choosing the Right Card Set

Consider these factors:

  • Team experience: New agile teams often start with t-shirt sizes before graduating to Fibonacci
  • Estimation level: Use t-shirt sizes for epics, Fibonacci for stories
  • Organizational culture: Choose what resonates with your team's mindset
  • Consistency: Once chosen, stick with it—switching mid-project creates confusion

Most mature agile teams converge on modified Fibonacci because it offers the best balance of simplicity, speed, and accuracy.

Best Practices for Facilitators

The facilitator plays a crucial role in Planning Poker success. Whether you're a Scrum Master, Product Owner, or team lead, these practices will help you run effective sessions.

Before the Session

Prepare the backlog: Ensure stories meet your definition of ready. Each story should have:

  • Clear description of the feature or change
  • Acceptance criteria defining "done"
  • No major technical unknowns (or spike stories scheduled to resolve them)
  • Proper priority order

Set expectations: Share the agenda and expected outcomes. Let the team know:

  • How many stories you aim to estimate
  • Time allocated (typically 1-2 hours)
  • Any changes to the usual process

Choose the right tool: For remote teams, use a digital Planning Poker tool that supports your workflow. Look for features like:

  • Real-time synchronization across participants
  • Integration with your backlog tool (Jira, Linear, Azure DevOps)
  • Voting history and analytics
  • Mobile support for hybrid sessions

During the Session

Timebox discussions: Allocate 3-5 minutes for initial discussion per story, 2-3 minutes for convergence discussions after voting. Use a visible timer to keep the session moving.

Encourage participation: Explicitly invite quieter team members to share their perspectives. Ask open-ended questions like:

  • "What technical approach would you take for this?"
  • "Does anyone see complexity that hasn't been mentioned?"
  • "What could go wrong with this implementation?"

Stay neutral: As facilitator, avoid injecting your own estimates or opinions until after others have spoken. Your role is to draw out the team's thinking, not to steer toward your preferred estimate.

Manage dominant voices: If one person consistently talks over others, gently intervene:

  • "Thanks for that insight. Let's hear from others who haven't shared yet."
  • "I want to make sure we're getting diverse perspectives."

Focus on relative sizing: Remind the team they're estimating relative complexity, not absolute time. Use your reference stories as anchors.

Watch for signs of fatigue: After 45-60 minutes of estimation, effectiveness drops. Take a 5-10 minute break if needed, or schedule a second session rather than pushing through fatigue.

After the Session

Document decisions: Record not just the estimates but also key assumptions or risks discussed. Future you will thank present you when revisiting these stories later.

Track accuracy over time: Compare estimates to actual effort to calibrate the team's estimation skills. Don't punish inaccuracy—use it as a learning tool.

Gather feedback: Periodically ask the team:

  • "Is Planning Poker helping us make better estimates?"
  • "Should we adjust our process in any way?"
  • "Are there stories we consistently over/underestimate?"

Celebrate improvement: Recognize when the team's estimates become more accurate or consensus is reached faster. This positive reinforcement builds confidence in the process.

Best Practices for Participants

Every team member bears responsibility for Planning Poker's success. Here's how to be an effective participant.

Come Prepared

Review stories beforehand: Don't see user stories for the first time during the session. Read them in advance and think about implementation approaches.

Bring questions: If a story is unclear, flag it early. Don't wait until the session to discover a story lacks sufficient detail.

Know your recent velocity: Understand how much work the team typically completes per sprint to inform your estimates.

During Voting

Estimate independently: Don't peek at others' cards or discuss estimates before the reveal. Your initial judgment is valuable precisely because it's uninfluenced.

Think in relative terms: Compare the new story to reference stories. Is it simpler or more complex than that 5-point story you completed last sprint?

Consider all aspects of effort:

  • Coding complexity
  • Testing requirements
  • Code review and rework
  • Integration challenges
  • Documentation needs
  • Deployment complexity

Be honest about uncertainty: If you genuinely don't understand a story well enough to estimate, use the "?" card. This signals a need for more information.

Vote decisively: Don't overthink it. Planning Poker works because it aggregates multiple quick judgments, not because each individual estimate is perfect.

During Discussion

Explain your reasoning: When you're an outlier (high or low), clearly articulate what informed your estimate:

  • "I estimated high because this requires database schema changes"
  • "I estimated low because I just built similar functionality last sprint"

Listen actively: Others may know things you don't. Be willing to adjust your thinking based on new information.

Ask clarifying questions: If someone mentions complexity you don't understand, ask:

  • "Can you elaborate on why that makes it harder?"
  • "Could we approach it differently to simplify?"

Be respectful of disagreement: Divergent estimates aren't personal conflicts—they're opportunities to learn and improve.

Building Trust

Don't sandbag estimates: Deliberately overestimating to create slack time erodes trust and undermines sprint planning.

Admit what you don't know: It's better to flag uncertainty than to guess and be wrong later.

Share lessons learned: If you've done similar work before, share what made it easier or harder than expected.

How to Handle Disagreements and Outliers

Divergent estimates are where Planning Poker shines. Here's how to navigate them productively.

Why Divergence Is Valuable

When estimates range from 3 to 13, it signals that team members have different mental models of the work. This is information you want to surface—better to discover these differences now than after committing to a sprint.

Common causes of divergence:

  • Knowledge gaps: One person knows about a complication others don't
  • Different assumptions: People are imagining different implementation approaches
  • Experience differences: Someone has done similar work and knows it's harder/easier than it appears
  • Story ambiguity: The story isn't clear enough for consistent interpretation

The High-Low Discussion Protocol

When estimates diverge, follow this protocol:

  1. Start with extremes: Ask the highest and lowest estimators to explain their reasoning
  2. Listen for new information: Did someone raise a consideration others missed?
  3. Clarify the story: Does the discussion reveal ambiguity in the requirements?
  4. Check assumptions: Are people imagining different approaches or scopes?
  5. Re-estimate: Armed with shared understanding, vote again

When Divergence Persists

If estimates still vary widely after discussion:

Option 1: Break down the story

Large, vague stories naturally generate divergent estimates. Break it into smaller, more concrete stories:

  • Original: "Build user profile page" (estimates: 3, 8, 13, 21)
  • Broken down:
    • "Create profile page layout and routing" (3 points)
    • "Implement profile data API" (5 points)
    • "Add profile image upload" (8 points)
    • "Build profile privacy controls" (5 points)

Option 2: Schedule a spike

If uncertainty stems from technical unknowns, schedule a time-boxed research task (spike) to gather information before estimating.

Option 3: Use the higher estimate

When in doubt, err on the side of caution. Under-estimating causes missed deadlines and team stress. Over-estimating occasionally finishing early is a pleasant surprise.

Option 4: Average or median

Take the mathematical middle ground. This works best when divergence is moderate (e.g., estimates cluster around 5 and 8).

Option 5: Defer the story

If the team can't reach reasonable consensus, the story may not be ready to estimate. Return it to the Product Owner for refinement.

Red Flags to Watch For

Certain patterns indicate deeper problems:

  • Consistently wide divergence: Your stories may need better grooming before estimation
  • One person always estimates high/low: This person may need coaching or have different quality standards
  • Silent convergence without discussion: People may be anchoring on others' estimates rather than thinking independently
  • Estimation takes forever: Stories are too large or too vague—break them down

Turning Disagreement Into Learning

The best teams view divergent estimates as learning opportunities:

  • "Why did I not see that complexity? What should I look for next time?"
  • "How can we document this so future team members know about this gotcha?"
  • "Should we update our reference stories based on this discussion?"

This mindset transforms estimation from a chore into a continuous improvement practice.

The Benefits of Planning Poker

Why has Planning Poker become the dominant agile estimation technique? The benefits are substantial and research-backed.

Improved Estimation Accuracy

Studies show that Planning Poker can improve estimation accuracy by up to 40% compared to individual expert estimates. This improvement comes from:

  • Diverse perspectives: Different team members catch different complexities
  • Collective intelligence: Groups make better predictions than individuals
  • Discussion and learning: Conversation reveals hidden assumptions and risks

Notably, this accuracy improvement is greatest for uncertain, complex work—exactly the type of work where accurate estimation is most valuable.

Bias Mitigation

Planning Poker systematically counters several cognitive biases:

  • Anchoring bias: Simultaneous estimation prevents early estimates from unduly influencing others
  • Authority bias: Junior developers aren't pressured to agree with senior developers
  • Optimism bias: High estimators counterbalance overly optimistic low estimators
  • Availability bias: Discussion brings to mind complexities that wouldn't occur to individuals

By structuring the process to minimize these biases, Planning Poker produces more objective estimates.

Enhanced Team Alignment

Beyond accuracy, Planning Poker creates shared understanding:

  • Technical approach: Team members align on how to implement features
  • Acceptance criteria: Discussion clarifies what "done" means
  • Dependencies and risks: Potential blockers surface early
  • Knowledge sharing: Experienced team members transfer knowledge to newer members

This alignment means fewer surprises during implementation and less rework from miscommunication.

Increased Team Engagement

Planning Poker makes estimation collaborative and even fun:

  • Everyone participates: Every voice is heard and valued
  • Gamification: The card-playing mechanic is more engaging than spreadsheet-based estimation
  • Social interaction: Remote teams benefit from the structured collaboration
  • Psychological safety: The process normalizes disagreement and uncertainty

Engaged teams produce better estimates and build stronger working relationships.

Better Sprint Planning

Accurate estimates directly improve sprint planning:

  • Right-sized sprints: The team commits to achievable work
  • Predictable velocity: Stakeholders get reliable delivery forecasts
  • Reduced burnout: Teams aren't constantly overcommitted and stressed
  • Better prioritization: Product Owners make informed trade-offs between features

The downstream effects of better estimation ripple through the entire organization.

Knowledge Transfer

For distributed or growing teams, Planning Poker facilitates knowledge transfer:

  • Onboarding: New team members learn about the codebase through estimation discussions
  • Cross-training: Backend developers learn about frontend complexity and vice versa
  • Documentation gaps: Discussion reveals where documentation is missing or outdated
  • Institutional knowledge: Long-tenured members share context about legacy systems

This makes the team more resilient and reduces key-person dependencies.

Getting Started with Planning Poker

Ready to implement Planning Poker? Here's how to get started successfully.

Step 1: Get Buy-In

Before introducing Planning Poker, ensure your team and stakeholders understand:

  • The benefits: Better estimates, team alignment, knowledge sharing
  • The time investment: Initial sessions may take longer as the team learns
  • The commitment: Planning Poker works best with consistent practice

If you're meeting resistance, propose a trial period: "Let's try this for three sprints and then retrospect on whether it's helping."

Step 2: Choose Your Tools

For co-located teams: Physical Planning Poker cards are inexpensive and tactile. You can:

  • Buy commercial decks ($10-30)
  • Print free templates online
  • Use a mobile app where everyone holds up their phone

For remote or hybrid teams: Use a digital Planning Poker tool. Key features to look for:

  • Real-time synchronization: Everyone sees votes revealed simultaneously
  • Backlog integration: Import stories from Jira, Linear, Azure DevOps, etc.
  • Voting history: Track estimates over time
  • No account required for guests: Stakeholders and contractors can join easily
  • Free tier available: Start without budget approval

Popular options include:

  • Planning Poker App (planning-poker.app): Free tool with session persistence, real-time updates, and anonymous join options—perfect for both internal teams and external consultants
  • Scrum Poker Online: Simple, no-frills estimation
  • Parabol: Includes additional agile ceremony features
  • Planning Poker by Mountain Goat Software: The original from Mike Cohn

Many teams prefer tools that allow anonymous participation without requiring account creation, especially when including external stakeholders or contractors in estimation sessions.

Step 3: Establish Reference Stories

Before your first Planning Poker session:

  1. Identify 3-5 stories your team has recently completed
  2. Assign relative sizes (3, 5, 8, 13 points) that feel appropriate
  3. Write brief descriptions of why each story received that size
  4. Share these reference stories with the team

Update your reference stories quarterly or when your team's composition or technology stack changes significantly.

Step 4: Prepare Your First Session

For your inaugural Planning Poker session:

  • Start small: Estimate 5-10 stories, not the entire backlog
  • Pick clear stories: Choose well-defined stories to build confidence
  • Allocate extra time: Your first session will take longer as the team learns
  • Designate a facilitator: Someone comfortable with the process should guide the team

Step 5: Run Your First Session

Follow the step-by-step process outlined earlier:

  1. Present a story
  2. Discuss and clarify
  3. Estimate simultaneously
  4. Discuss divergence
  5. Re-estimate
  6. Record consensus

Don't worry if it feels awkward at first—teams typically become proficient after 2-3 sessions.

Step 6: Retrospect and Refine

After your first few Planning Poker sessions, hold a focused retrospective:

  • What went well?
  • What felt awkward or slow?
  • Are there aspects of our process we should adjust?
  • Do we need different reference stories?
  • Should we adjust our card values?

Common refinements teams make:

  • Adding a 0 or 0.5 card for trivial work
  • Time-boxing discussions more strictly
  • Breaking down large stories before the session
  • Involving QA or DevOps in estimates

Step 7: Track and Improve

Over time, compare your estimates to actual effort:

  • Which types of stories do you consistently overestimate?
  • Which do you underestimate?
  • Are there patterns in what causes divergence?
  • How accurate is your sprint velocity becoming?

Use this data to calibrate your estimation skills, not to punish inaccuracy. Estimation is a learned skill that improves with practice and feedback.

Advanced Tips for Experienced Teams

Once your team is comfortable with Planning Poker basics, these advanced techniques can further improve your estimation practice.

Asynchronous Planning Poker

For distributed teams across multiple time zones, synchronous Planning Poker sessions can be challenging. Consider asynchronous estimation:

  1. Product Owner posts stories in a shared tool
  2. Team members estimate independently within a time window (e.g., 24 hours)
  3. Tool reveals results and flags divergent estimates
  4. Team discusses divergent estimates via async communication (comments, chat)
  5. Team re-estimates or Product Owner makes final decision

This approach sacrifices some discussion richness but works well for globally distributed teams.

Estimation Confidence Intervals

Add a second dimension to estimates by tracking confidence:

  • Green card: High confidence in this estimate
  • Yellow card: Moderate confidence, some uncertainty
  • Red card: Low confidence, significant unknowns

This helps Product Owners prioritize stories that need more refinement and alerts stakeholders to risky estimates.

Estimation Calibration Sessions

Quarterly, run a retrospective focused specifically on estimation:

  1. Review 10-20 recently completed stories
  2. Compare estimates to actual effort
  3. Discuss patterns in over/underestimation
  4. Update reference stories if needed
  5. Adjust estimation approach based on learnings

Progressive Refinement

For large initiatives, estimate in multiple passes:

  1. Epic level: Use t-shirt sizes for high-level themes
  2. Story level: Break epics into stories and use Fibonacci
  3. Task level: During sprint planning, break stories into tasks

Each level provides appropriate precision for that planning horizon.

Specialized Card Sets

Some teams create custom card sets for specialized estimation:

  • Risk cards: Estimate technical risk independently from effort
  • Value cards: Product Owners estimate business value separately
  • Priority cards: Stakeholders vote on priority using similar mechanics

These variations leverage Planning Poker's consensus-building mechanics beyond pure effort estimation.

Integration with Continuous Planning

Move beyond sprint-by-sprint estimation to continuous backlog refinement:

  • Dedicate 1-2 hours weekly to estimation
  • Estimate stories as soon as they're ready, not all at once
  • Maintain a buffer of estimated, ready-to-work stories
  • Reduce the overhead of dedicated planning meetings

This creates a more sustainable rhythm and avoids marathon estimation sessions.

Estimation Complexity Thresholds

Establish team norms around estimate sizes:

  • 1-3 points: Single-feature, single-component changes
  • 5-8 points: Multi-component changes or moderate complexity
  • 13 points: Complex features requiring significant design
  • 21+ points: Must be broken down—too large for a single sprint

These guidelines help teams self-organize story breakdown without constant facilitation.

Velocity Banding

Track your team's velocity as a range rather than a single number:

  • Historical average: 42 points per sprint
  • Low band: 35 points (conservative sprint commitment)
  • High band: 50 points (optimistic sprint commitment)

This acknowledges natural variability and prevents over-committing based on a single "magic number."

Common Pitfalls to Avoid

Even experienced teams can fall into these Planning Poker traps:

Estimating in Time Units

Avoid estimating in hours or days—use abstract story points instead. Time-based estimates:

  • Create false precision
  • Don't account for productivity variations
  • Turn estimation into individual performance tracking
  • Make people defensive about their estimates

Story points keep estimation relative and team-focused.

Allowing Anchoring

If someone blurts out "this is definitely an 8" before the vote, you've lost the benefit of independent estimation. Firmly enforce simultaneous reveals.

Letting Non-Developers Estimate

Only people doing the work should estimate effort. Product Owners and stakeholders can participate in discussion but shouldn't vote on effort estimates (though they may vote separately on value or priority).

Skipping Discussion on Consensus

When everyone picks the same card, it's tempting to move on immediately. But occasionally ask: "Does everyone agree for the same reasons?" You might discover people are estimating based on different assumptions.

Estimating Too Granularly

Don't estimate every tiny task. Reserve Planning Poker for stories that will take at least a few hours of work. Trivial tasks can be batched or estimated without the ceremony.

Ignoring Persistent Outliers

If one team member consistently estimates much higher or lower than others, investigate:

  • Do they have different quality standards?
  • Are they aware of complexities others aren't?
  • Do they need coaching on the estimation scale?

Don't just average away persistent divergence—address the underlying cause.

Using Planning Poker for Performance Reviews

Never use estimates to evaluate individual performance. This destroys trust and creates perverse incentives (sandbagging or unrealistic optimism). Estimates are for planning, not performance management.

Conclusion: Your Path to Estimation Mastery

Planning Poker transforms agile estimation from a frustrating guessing game into a collaborative practice that builds team alignment, improves accuracy, and facilitates knowledge sharing. By leveraging consensus-based estimation, the Fibonacci sequence, and structured discussion, your team can achieve estimation accuracy improvements of 40% or more.

Success with Planning Poker requires:

  • Commitment to the process: Give it 3-5 sprints before judging effectiveness
  • Skilled facilitation: Keep sessions focused and inclusive
  • Continuous improvement: Retrospect on your estimation practice and refine
  • Trust and psychological safety: Create space for disagreement and uncertainty

Whether you're just starting your agile journey or looking to refine your scrum estimation practices, Planning Poker provides a proven framework for better forecasting, stronger teams, and more predictable delivery.

Ready to get started? Free Planning Poker tools like planning-poker.app make it easy to run your first session today—no account required, just create a session and invite your team. Start with a handful of well-defined stories, establish your reference points, and experience the power of collective estimation.

Your team's estimation mastery begins with a single Planning Poker session. The insights gained from that first divergent estimate—where a 3 and a 13 reveal radically different assumptions—will show you why this technique has become the gold standard for agile teams worldwide.

Master Planning Poker, and you'll master one of the most impactful practices in modern software development.


About Planning Poker App: Planning Poker App is a free online tool designed to help agile teams conduct remote estimation sessions with real-time synchronization, anonymous participation, and seamless session management. Whether your team is fully remote, hybrid, or occasionally distributed, Planning Poker App provides the collaborative estimation experience that drives better planning and stronger alignment.

Related Articles

Ready to Start Planning?

Put these planning poker techniques into practice with our free tool. Create a session in seconds and start improving your team's estimation process today.